Partner

Home » PARTNER

Since 1987, AWM Spa has been developing, designing and manufacturing high-technology machines for the processing of reinforcement steel such as standard and special mesh welding machines, high-speed wire straightening and cutting machines, lattice girder machines, automatic mesh bending machines and special machines for production of tunnel reinforcement elements.
AWM’s machines find application in various fields: steel processing centers for the production of stirrups, special electrowelded mesh manufacturers, lattice girder and electrowelded mesh producers, precast companies, large construction and road-building companies.
More than 600 hundred machines installed in over 50 countries

DJI_0014
Siderengineering_Logo

Sider Engineering S.p.A., an experience started in 1974 with the name of B.M.I., consolidated in thirty years of activity as Sider Montaggi, continues from 2007 with the SIDER ENGINEERING trademark. Always engaged in steel manufacturing plants engineering, the growth of the professionalism and of the company structures has accompanied the evolution of the product. The early days were characterized by the provision of assembly services only on behalf of third parties, then, with the creation of an industrial reality, revision and maintenance works were developed up to the construction of complete new plants. There are thousands of works and projects carried out from 1974 to today in every sector of the steel industry and in every continent.

DKMGroup
DKM_Logo_DEF_small

With more than a decade of experience, DKM Group represent with local offices the Sokol Engineering S.r.l. in middle-east. A strong local team can support our clients on commercial and financial, and also with a technical local presence. A full satisfation on-site of a technical team to guarantee intallation, after sales and spare parts services. DKM GROUP with its on-site service can check and verify the possibility for the productivity and final quality of products and in collaboration with the Customers can check and study efficiency of the plan with the verification of all the activities that are taking place in and arounf the line. DKM Group take particular attention concerning the maintenance phases and the causes of the unplanned stops of the plan with the verify of a predictive maintenance systems in order to reduce or control the stops of the plant.